cn

Shanghai Metro Line 17

Shanghai Metro Line 17 is about 35 kilometers long and has 13 stations. The 1, 2, and 4 sections are six stations in Oriental Oasis, Zhujiajiao, Dianshan Lake, Qiying Road, Jiasong Middle Road and Zhaoxiang.


One standard oriental green boat and Zhujiajiao are two-story concrete structures on the ground, two standard Dianshan Lake and Qiying Road are underground stations, and the second floor of Jiasong Middle Road and Zhaoxiang on the four standards is in the form of steel structure. The Oriental Green Boat Station adopts a three-column and two-span frame structure with a total height of 23.8 meters. It is a roadside elevated two-story island platform station. The main body of the station is located in the south side of the Huqingping Highway, with a total construction area of 8547 square meters. The Zhujiajiao Station is a three-column and two-span frame structure with a total height of 23.9m. It is a three-story island platform station on the roadside. The main body of the station is located on the south side of Huqingping Highway and on the west side of Zhufeng Highway, along the east-west direction. The building area is 11,222 square meters. The Zhaoxiang station is a three-story, three-span frame structure with an elevated three-story 8.5m side platform station. The main station is located in the west of Zhaozhong Road and in the green belt of Yinggang Road. The total construction area of the station is 11,362 m2 and the height of the station is 23.55 m. The main body of Jiasong Middle Road Station is an elevated three-story 8.5m side platform station with two columns and three spans. The main body of the station is located in the west of Jiasong Middle Road and in the green belt of Yinggang Road. The total construction area is 12255m2 and the building height is 19.5 meters.


During the implementation of the project, we dispatched engineers on site and actively cooperated with the construction unit for 3 months.


The channel steel and fittings are epoxy sprayed and are available in two colors, 7004 and 7005, with a channel thickness of 2.5 mm.


The project requires the use of finished brackets for the entire station, and the public areas and management rooms corridors are finished brackets.